NameDescriptionTypeAdditional information
StartLevel

Starting level of water stress on the day stressing begins. 100% = 100% crop ET, 60 = 60% Crop ET

integer

None.

EndLevel

The level of water stress at the end of stress period.

integer

None.

StartDate

Indicates when the stress period starts

date

None.

EndDate

End date of the stress period

date

None.